Hot Work Permits with EasyPower

The first team meeting facility managers should schedule after receiving a newly completed Arc Flash Hazard Study is the one with their maintenance supervisors to review all buses identified as Arc Flash Hazards and single out all that may require hot work. The purpose of the meeting will be to address how best to provide the safest condition possible for any necessary hot work. The ultimate goal that the team should target is the competition of the document known as the Hot Work Permit template for each procedure and each system element that the teams agrees requires attention while the system is still energized. During this Tuesday Refresher, Jim Chastain, EasyPower applications engineer, will detail the procedure to create HTML templates that EasyPower will may use to create Hot Work Permits as needed by your electrical maintenance team.