Arc Flash the Easy Way - Part 2: Data Collection

Of the overall time involved in an Arc Flash study, data collection can be the most costly if not properly planned. Eliminating the need for repeated trips to the site and avoiding excessive delays and cost is the focus for this presentation. Second in the Arc Flash Risk Assessment series, this presentation emphasizes the benefits that can be recognized both in cost reduction and employee education when facilities maintenance teams are part of the process. This updated presentation includes information on the many changes to data collection due to new calculation parameters in the IEEE 1584-2018 standard. 

Download a Free Demov2365

Jim Chastain's Presentation

Click on the Fullscreen Mode  in the lower right corner to view as a full-screen presentation. Press the Esc key to exit full screen more.